500 kV Transmission Line

PROJECT NAME

500 kV Transmission Line

LOCATION Maekhong River Crossing (Mukdahan)
OWNER EGAT
is_500kv4 is_500kv3 is_500kv2 is_500kv1
PROJECT DESCRIPTION
The scope include structural design and construction
supervision of intermediate tower foundation at Maekhong River
Finite Element Analysis Software (Sap) was employed to simulate the structures.
Current, Ship impact, Wind and Earthquake load are included
in structural design.
SERVICE RENDERED Structural analysis& Design , Construction supervision
DURATION 2006