Underground Transmission Line between BANGKAPI and CHIDLOM Terminal Station

PROJECT NAME

Underground Transmission Line between BANGKAPI and CHIDLOM Terminal Station

LOCATION Bangkok
OWNER Metropolitan Electricity Authority
 is_utl_bangkapi5 is_utl_bangkapi4 is_utl_bangkapi3 is_utl_bangkapi2 is_utl_bangkapi1
PROJECT DESCRIPTION
The scope include structural design of underground tunnel, shafts, underground galleries and cooling plant building.
Checking effect of the tunneling to existing MRTA tunnel

  • Structural Design of Harbor, total area = 2,500 sq.m.
  • Project cost = 16,250,000 baht.
  •  Structural Design of a ship building with a slipway, total 
  • area = 5,700 sq.m. Project cost = 45,000,000 baht.
SERVICE RENDERED Structura analysis & Design , Architectural
DURATION 2005 -2006