Renovated Port

PROJECT NAME
Renovated Port
LOCATION Chonburi, Thailand
OWNER Unithai Shipyard and Engineering Ltd.
 Renovated Port Renovated Port Renovated Port
 PROJECT DESCRIPTION
Strengthening of jetty with external perstressing method
 WORK EXECUTION  Port Harbour
 PROJECT COST  approximately 19.9 million baht
 SERVICE RENDERED  Structural analysis & Design
 DURATION  June 2007

CP Klang “Breaded Line”

PROJECT NAME
CP Klang “Breaded Line”
LOCATION Klang, Rayong , Thailand
OWNER CP
 CP Klang "Breaded Line" CP Klang "Breaded Line" CP Klang "Breaded Line"
 PROJECT DESCRIPTION
Strengthening the Steel Truss and Structure with Sling and Carbon Fibre Reinforced Polymer (CFRP) of The CP Klang “Breaded Line”
 WORK EXECUTION  Industrial
 PROJECT COST  approximately 7,274,000 baht
 SERVICE RENDERED  Structural analysis & Design
 DURATION  1 May 2005 – 31 July 2005

Biomass Dryer Project

PROJECT NAME
Biomass Dryer Project
LOCATION Saraburi, Thailand
OWNER The Siam Cement (Kaeng Khoi) Co., Ltd.
Biomass Dryer Project Biomass Dryer Project
 PROJECT DESCRIPTION
Structural Rehabitation which composed of
• Recheck capacity of existing structure subjection to existing condition
• Analysis of existing structure subjection to new load condition
• Design of structural strengthening by adding of new steel structure and CFRP
• Analysis and design
 WORK EXECUTION  Industrial
 PROJECT COST  approximately 9 million baht
 SERVICE RENDERED  Structural analysis & Design
 DURATION  October 2007

Renovation of Paper&Packing Business Ban PongMill

PROJECT NAME
Renovation of Paper&Packing Business Ban PongMill
LOCATION Saraburi, Thailand
OWNER SCI Plant Services Co., Ltd.
Renovation of Paper&Packing Business Ban PongMill Renovation of Paper&Packing Business Ban PongMill
 PROJECT DESCRIPTION
Structural Rehabitation which composed of
• Recheck capacity of existing structure subjection to existing condition
• Analysis of existing structure subjection to new load condition
• Design of structural strengthening by adding of new steel structure and CFRP
 WORK EXECUTION  Industrial
 PROJECT COST  approximately 10 million baht
 SERVICE RENDERED  Structural analysis & Design
 DURATION  March 2005

TCL Boiler steel structure & foundation design

PROJECT NAME
TCL Boiler steel structure & foundation design
LOCATION Rayong, Thailand
OWNER TRC Construction Public Co., Ltd.
TCL Boiler steel TCL Boiler steel
 PROJECT DESCRIPTION
The new boiler weight 180 tons shell be installed at the TCL.Therefore new super structures and sub-structures have to be designed to accommodate the boiler. The super-structures will be designed as the steel structure while the foundations will be designed as reinforced concrete structures with bored piles.
Steel structure
• The analysis and design steel super-structures including plat from and stair cases
• The engineering details of members and joint (bolt) connections
• The 3-Dimensional Drawings (members only)
• The 2-Dimensional Shop Drawings
Reinforce concrete
• The analysis and design of reinforced concrete sub-structures for boiler and stack support
• The engineering details drawings
Misc
• Recheck existing structure for support new steam pipeline
 WORK EXECUTION  Industrial
 PROJECT COST  approximately 550 million baht
 SERVICE RENDERED  Structural analysis & Design
 DURATION  May 2006

Praekasa Power Plant

PROJECT NAME
Praekasa Power Plant
LOCATION Samutprakarn, Thailand
OWNER Praekasa Company
 Praekasa Power Plant 
Praekasa Power PlantPraekasa Power Plant
 PROJECT DESCRIPTION
The scope include structural design ,piping design ,3D model Equipment, Cable Duct & Cable tray
 WORK EXECUTION  Industrial
 PROJECT COST  approximately 3 million baht
 SERVICE RENDERED  Structural analysis & Design, Architectural Design, Piping Design, Mechanical & Electrical Design
 DURATION  April 2005

Pipe Bridge Foundation For MTP Project Box Culvert

PROJECT NAME
Pipe Bridge Foundation For MTP Project Box Culvert
LOCATION Rayong, Thailand
OWNER PTT Public Co., Ltd.
   Pipe Bridge Foundation Pipe Bridge Foundation Pipe Bridge Foundation
 PROJECT DESCRIPTION
The scope includes civil design of M/R station building, pipe stress analysis and construction supervision.
• Finite Element Analysis Software (Ansys, Staad, Sap, Plaxis) was employed to simulate the structures.
• Detail design was done by using AutoCad
 WORK EXECUTION  Industrial
 PROJECT COST  approximately 205 million baht
 SERVICE RENDERED  Structural analysis & Design
 DURATION  January – October 2002

TLP Gas Pipeline Project

PROJECT NAME
TLP Gas Pipeline Project
LOCATION Rayong, Thailand
OWNER PTT Public Co., Ltd.
  TLP Gas Pipeline 2 TLP Gas Pipeline 1
 PROJECT DESCRIPTION
The scope includes design of building and M/R station.
• Pipe stress analysis
• Finite element analysis software (Staad, Sap) was
• Employed to simulate the structures.
• Detail design was done by using AutoCAD
 WORK EXECUTION  Industrial
 PROJECT COST  approximately 65 million baht
 SERVICE RENDERED  Structural analysis & Design
 DURATION  2002 – 2003

Retrofit Of Thai Poly Acrylic Factory

 

PROJECT NAME
Retrofit Of Thai Poly Acrylic Factory
LOCATION Nakornpathom, Thailand
OWNER Thai Polyacrylic Public Co.,Ltd.
  Retrofit Of Thai Poly Acrylic Factory
 PROJECT DESCRIPTION
  The scope includes retrofit & renovation of the factory as follows:
• Strengthening of crane rail to carry more load.
• Underpinning of the existing foundation because of differential settlement of the foundation.
• Design new rail for moving platform to carry more load.
• Enlarge existing lift pit.
• Finite element analysis software (Staad, Sap) was employed to simulate the structures.
• Detail design was done by using AutoCAD
• Finite element analysis software
• Retrofit the factory without disturbed
 WORK EXECUTION  Industrial
 PROJECT COST  approximately 200 million baht
 SERVICE RENDERED  Structural analysis & Design
 DURATION  2005