New CP-Meiji Plant Factory

PROJECT NAME

New CP-Meiji Plant  Factory

LOCATION Nhongkhae, Saraburi
OWNER CP Mejij Co.,Ltd
 i_new_cpmeiji
PROJECT DESCRIPTION
The Works include, but are not limited to, the
following elements:

  • This Building is 1.50 storeys and have 23,000 sq.m area first floor is Factory area second and third floor is car 
  • Project cost approximately 500 million baht
SERVICE RENDERED Structural analysis & Design
Architectural Design, Mechanical&Electrical Design,
Sanitary Design
DURATION 2011 – 2013

Swan New Warehouse

PROJECT NAME

Swan New Warehouse

LOCATION Samutprakarn
OWNER Swan Industries (Thailand) Co., Ltd.
 i_swan_wh4 i_swan_wh3 i_swan_wh2 i_swan_wh1
PROJECT DESCRIPTION
The Works include, but are not limited to, the
following elements:

  • This Building is 3.50 storeys and have 14,000 sq.m area first floor is Factory area second and third floor is cargo area
  • Main structure is reinforce concrete and steel roof truss
  • Project cost approximately 150 million baht.
SERVICE RENDERED Structural analysis&Design Architectural Design, Mechanical&Electrical Design, Sanitary Design
DURATION 2012 – 2013

CPF-RAM Factory

PROJECT NAME

CPF-RAM Factory

LOCATION Latlumkaeo, Pathumthani
OWNER CP RAM CO.,LTD
 i_cpf_ram1
PROJECT DESCRIPTION
The Works include, but are not limited to, the
following elements:

  • This Building is 1.50 storeys and have 6,000 sq.m area first floor is Factory area second and third floor is cargo area
  • Main structure is reinforce concrete and steel roof truss
  • Project cost approximately 400 million baht.

Swan Factory

PROJECT NAME

Swan Factory

LOCATION Samutprakarn
OWNER Swan Industries (Thailand) Co., Ltd.
 i_swan2 i_swan1
PROJECT DESCRIPTION
The Works include, but are not limited to, the
following elements:

  • This Building is 3.50 storeys and have 26,000 sq.m area first floor is Factory area second and third floor is cargo area
  • Main structure is reinforce concrete and steel roof truss

Maesord Clean Energy

PROJECT NAME

Maesord Clean Energy

LOCATION Maesord, Tark Province
OWNER Mitr Phol Sugar Corp., Ltd.
 i_maesord_clean2 i_maesord_clean1
PROJECT DESCRIPTION
The scopes are

  • Structural and Architect design
  • Main objective of this plant is to produce ethanol which has been added to gasoline supplier to fuel’s firms which are Main factory buildings, office & canteen building, staff, dormitory building and etc.
  • Area summary of the project is around 35,000-40,000 sq.m. and the site , Area is 600 rais

Mitr Lao Sugar Factory

PROJECT NAME

Mitr Lao Sugar Factory

LOCATION Savannaket, Laos PDR
OWNER MitrLao Co., Ltd.
 i_mitr_lao2 i_mitr_lao1 i_mitr_lao3
PROJECT DESCRIPTION
The scope include

  • Analysis & design of the structure 
  • The main objective of this factory is produce raw sugar supply to European
  • The product included of 30 building which are.
  • Main sugar factory, office & canteen building, staff house, htm morass tank, and etc.

Area summary of the project is around 40,000 sq.m. and
the site area is 600 rais

SERVICE RENDERED Structural analysis & Design
DURATION July 2007 – December 2007

New Melt Shop Factory

PROJECT NAME

New Melt Shop Factory

LOCATION Rayong
OWNER Siam Yamato Co., Ltd.
 i_newmelt2 i_newmelt1
PROJECT DESCRIPTION
The scope include structural design of melt shop factory

  • Finite Element Analysis Software (Sap) was employed to simulate the structures.
  • Wind and Earthquake load are included in structural design.
  • Detail design & shop drawing was done by AutoCAD and Tekha software
  • Machine foundation design drawing was drawn using Solidwork
SERVICE RENDERED Structural analysis& Design, Construction supervision
DURATION 2007 – 2008

TCL Boiler steel structure & foundation design project

PROJECT NAME

TCL Boiler steel structure & foundation design project

LOCATION Rayong
OWNER TRC Construction Public Company Limited
 is_tcl_boiler1 is_tcl_boiler2
PROJECT DESCRIPTION
The new boiler weight 180 tons shell be installed at
the TCL.Therefore new super structures and sub-structures have to
be designed to accommodate the boiler.
The super-structures will be designed as the steel structure while the
foundations will be designed as reinforced concrete structures with
bored piles.
Steel structure

  • The analysis and design steel super-structures including plat 
  • from and stair cases
  • The engineering details of members and joint (bolt) connections
  • The 3-Dimensional Drawings (members only)
  • The 2-Dimensional Shop Drawings

Reinforce concrete

  • The analysis and design of reinforced concrete sub-structures for boiler and stack support,
  • The engineering details drawings

Misc

  • Recheck existing structure for support new steam pipeline
  • Project cost approximately 550 million baht
SERVICE RENDERED Structural analysis & Design
DURATION May 2006