Star Marine Port Harbour Mahachai

PROJECT NAME

Star Marine Port Harbour Mahachai

OWNER Star Marine Engineering Co, Ltd.
 is_star_marine3 is_star_marine2 is_star_marine1
PROJECT DESCRIPTION
The scope include structural design and construction supervision of
Port and operation office at Samuthsakorn province
Project cost approximately 13 million baht
SERVICE RENDERED Structural analysis & Design,
Architectural Design, M&E Design and
Construction supervision
DURATION May 2006

Airport Rail Link

PROJECT NAME

Airport Rail Link

OWNER Railway Authority of Thailand
 is_airport_link6 is_airport_link5 is_airport_link4 is_airport_link3 is_airport_link2 is_airport_link1
PROJECT DESCRIPTION
The scope include independent structural checking of Super structure and strengthening design of viaduct.
SERVICE RENDERED Independent Checker for Super structure and strengthening of Viaduc
DURATION 2006

BTS sky train station

PROJECT NAME

BTS sky train station

LOCATION Rama IV Road, Sathorn, Bangkok
OWNER Bangkok Metropolitan Authority
 is_bts3 is_bts2 is_bts1
PROJECT DESCRIPTION
The scope include structural design BTS sky train station

  • Project cost approximately-million baht
SERVICE RENDERED Structural analysis & Design
DURATION 2007 – 2008

Underground Connecting Tunnel from Esplanade building to existing MRT Station

PROJECT NAME

Underground Connecting Tunnel  from Esplanade building to existing MRT Station

OWNER Siam Future Development Plc.
 is_utc_esplanade1 is_utc_esplanade4.png is_utc_esplanade3 is_utc_esplanade2
PROJECT DESCRIPTION
The scope include structural design of underground tunnel. The design also include checking and strengthening existing MRT station after connecting new tunnel.

Underground Transmission Line between BANGKAPI and CHIDLOM Terminal Station

PROJECT NAME

Underground Transmission Line between BANGKAPI and CHIDLOM Terminal Station

LOCATION Bangkok
OWNER Metropolitan Electricity Authority
 is_utl_bangkapi5 is_utl_bangkapi4 is_utl_bangkapi3 is_utl_bangkapi2 is_utl_bangkapi1
PROJECT DESCRIPTION
The scope include structural design of underground tunnel, shafts, underground galleries and cooling plant building.
Checking effect of the tunneling to existing MRTA tunnel

  • Structural Design of Harbor, total area = 2,500 sq.m.
  • Project cost = 16,250,000 baht.
  •  Structural Design of a ship building with a slipway, total 
  • area = 5,700 sq.m. Project cost = 45,000,000 baht.
SERVICE RENDERED Structura analysis & Design , Architectural
DURATION 2005 -2006

500 kV Transmission Line

PROJECT NAME

500 kV Transmission Line

LOCATION Maekhong River Crossing (Mukdahan)
OWNER EGAT
is_500kv4 is_500kv3 is_500kv2 is_500kv1
PROJECT DESCRIPTION
The scope include structural design and construction
supervision of intermediate tower foundation at Maekhong River
Finite Element Analysis Software (Sap) was employed to simulate the structures.
Current, Ship impact, Wind and Earthquake load are included
in structural design.
SERVICE RENDERED Structural analysis& Design , Construction supervision
DURATION 2006