The scope include structural design of underground tunnel, shafts, underground galleries and cooling plant building.
Checking effect of the tunneling to existing MRTA tunnel
- Structural Design of Harbor, total area = 2,500 sq.m.
- Project cost = 16,250,000 baht.
- Structural Design of a ship building with a slipway, total
- area = 5,700 sq.m. Project cost = 45,000,000 baht.
|