TCL Boiler steel structure & foundation design project

PROJECT NAME

TCL Boiler steel structure & foundation design project

LOCATION Rayong
OWNER TRC Construction Public Company Limited
 is_tcl_boiler1 is_tcl_boiler2
PROJECT DESCRIPTION
The new boiler weight 180 tons shell be installed at
the TCL.Therefore new super structures and sub-structures have to
be designed to accommodate the boiler.
The super-structures will be designed as the steel structure while the
foundations will be designed as reinforced concrete structures with
bored piles.
Steel structure

  • The analysis and design steel super-structures including plat 
  • from and stair cases
  • The engineering details of members and joint (bolt) connections
  • The 3-Dimensional Drawings (members only)
  • The 2-Dimensional Shop Drawings

Reinforce concrete

  • The analysis and design of reinforced concrete sub-structures for boiler and stack support,
  • The engineering details drawings

Misc

  • Recheck existing structure for support new steam pipeline
  • Project cost approximately 550 million baht
SERVICE RENDERED Structural analysis & Design
DURATION May 2006